Pine Bluff |
Code of Ordinances |
Chapter 28. WATER, SEWERS AND SEWAGE DISPOSAL |
Article V. PRETREATMENT OF DISCHARGES INTO THE WASTEWATER SYSTEM |
Division 3. PRETREATMENT OF WASTEWATER |
§ 28-228. Accidental discharge/slug control plans.
The manager shall evaluate whether each significant industrial user needs an accidental discharge/slug control plan or other action to control slug discharges. The manager may require any user to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control slug discharges. Alternatively, the manager may develop such a plan for any user. An accidental discharge/slug control plan shall address, at a minimum, the following:
(1)
Description of discharge practices, including nonroutine batch discharges;
(2)
Description of stored chemicals;
(3)
Procedures for immediately notifying the manager of any accidental or slug discharge, as required by section 28-271 of this article; and
(4)
Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response.
(Ord. No. 6381, § 3.3, 2-21-12)