Pine Bluff |
Code of Ordinances |
Chapter 28. WATER, SEWERS AND SEWAGE DISPOSAL |
Article V. PRETREATMENT OF DISCHARGES INTO THE WASTEWATER SYSTEM |
Division 4. INDIVIDUAL WASTEWATER DISCHARGE PERMITS |
§ 28-240. Application contents.
All users required to obtain a wastewater discharge permit by the manager shall submit an industrial wastewater discharge permit application to Pine Bluff Wastewater Utility, the form for which shall be provided by Pine Bluff Wastewater Utility. The information required in the permit application shall, where requested or appropriate, include, but is not limited to:
(1)
Name, address, and location of the industrial user or discharger and the name of the operator and owner with contact information.
(2)
Standard industrial classification number (SIC Code).
(3)
The nature and concentrations of any pollutants or materials prohibited or regulated by this article, including the EPA's priority pollutant listing for each pollutant or material.
(4)
The time of day and duration of each discharge.
(5)
The average daily and maximum daily flow rates including any daily, monthly, or seasonal variations. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in subsection 28-212(3) of this article (40 CFR 403.6(e)).
(6)
Site plans and details showing all plumbing including storm and sanitary sewers, sewer connections, manholes, sampling/inspection manholes the location and description of any pretreatment equipment, and the appropriate location for monitoring all wastes covered by the permit.
(7)
A description of facilities, activities, and plant processes including all materials which are or may be discharged to the public sewer.
(8)
A list of all raw materials used at the facility including MSDS (material safety data sheets) for all chemicals that are used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW.
(9)
Compliance schedules, where applicable, which meet applicable requirements of the federal regulations.
(10)
Any other information as may be deemed necessary by the manager to evaluate the wastewater discharge permit application.
Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. This could result in a delay in the issuance to the discharge permit.
(Ord. No. 6381, § 4.5, 2-21-12)