§ 7-245. Number of inspections.  


Latest version.
  • Three (3) inspections of plumbing work shall be made: first, the sewer when laid and jointed; second, the soil, waste, vent pipes; and third, after fixtures are set. The plumber shall notify the plumbing inspector when the work is ready for each inspection, and work shall be left uncovered until each inspection is made. The work shall be tested with water or as the plumbing inspector shall direct. The plumber shall make the required test in the presence of the inspector.

(Code 1967, § 27-2)